With a nameplate capacity of 30 MWAC, the project is comprised of 330,000 First Solar, Inc. photovoltaic modules and interconnects to AEP Texas. The output from the Barilla Solar project is sold into the ERCOT market.
Barilla Solar
Pecos County, TX

About
LRE's (Leeward Renewable Energy) Barilla Solar project, situated on 210 acres near the West Texas town of Fort Stockton, reached commercial operation in 2014.
Project Overview
0 MW
Renewable Energy Capacity
0
COD
OUTREACH
Community Involvement
LRE prioritizes responsibly sourced, U.S.-made components and local labor. The low-cost, emission-free power supply will help meet domestic energy needs.
As a dedicated member of the community, LRE will work hard to be a good neighbor. Our involvement goes beyond economic investment, job creation and providing emission-free energy. We strive to build lasting partnerships with local government, community organizations and individual neighbors. Throughout the life of the project, we pride ourselves on being open in our communication and responsive to feedback, and to ongoing community investment.
TIMELINE
Operational
2015ABOUT US
About LRE (Leeward Renewable Energy)
Founded in Texas in 2003, LRE (Leeward Renewable Energy) owns and operates 30+ wind, solar, and energy storage projects totaling over 4GW nationwide. LRE continues to help meet increased U.S. energy demand through our robust pipeline of new projects every year. We prioritize domestic jobs, local community partnerships, and protecting the land in our long-term approach to meet American energy needs. To learn more, visit www.lreus.com.
CONTACT
Contact us
If you have additional questions about Barilla Solar, please fill out the form or contact
Barilla Solar Public Affairs
reports@syntro.com
877.847.0828
"*" indicates required fields