The project is located adjacent to LRE’S 100-MW solar and storage Rabbitbrush project and 174-MW solar and storage Chaparral Springs project. The AVEP BESS facility is designed to support the resiliency and reliability of the California electrical grid and will be capable of storing over 500 MWhs of clean power that can be dispatched during peak load times to meet demand. LRE has entered into a Power Purchase Agreement (PPA) with Southern California Edison (SCE) to purchase energy from AVEP BESS. Construction of the AVEP BESS facility began in mid-2023, and the project became operational in 2024.
Antelope Valley BESS
Kern County, CA

About
LRE's (Leeward Renewable Energy) Antelope Valley BESS facility in Kern County, California is a 126–megawatt standalone battery energy storage system (BESS) in Kern County, California.
Project Overview
0 MW
Renewable Energy Capacity
0
COD
OUTREACH
Community Involvement
LRE prioritizes responsibly sourced, U.S.-made components and local labor. The low-cost, emission-free power supply will help meet domestic energy needs.
As a dedicated member of the community, LRE will work hard to be a good neighbor. Our involvement goes beyond economic investment, job creation and providing emission-free energy. We strive to build lasting partnerships with local government, community organizations and individual neighbors. Throughout the life of the project, we pride ourselves on being open in our communication and responsive to feedback, and to ongoing community investment.
TIMELINE
Operational
2024ABOUT US
About LRE (Leeward Renewable Energy)
Founded in Texas in 2003, LRE (Leeward Renewable Energy) owns and operates 30+ wind, solar, and energy storage projects totaling over 4GW nationwide. LRE continues to help meet increased U.S. energy demand through our robust pipeline of new projects every year. We prioritize domestic jobs, local community partnerships, and protecting the land in our long-term approach to meet American energy needs. To learn more, visit www.lreus.com.
CONTACT
Contact us
If you have additional questions about AVEP BESS, please fill out the form or contact
AVEP BESS Public Affairs
reports@syntro.com
877.847.0828
"*" indicates required fields