Copper Rays Solar

Nye County, NV

LRE subsidiary Copper Rays Solar, LLC will be constructing a 
renewable energy facility, generating up to 700 megawatts (MW) 
of solar power generation with up to 700 MW, 4–hour battery energy storage system (BESS) on Bureau of Land Management (BLM) land in Nye County, Nevada.

Icon
Up to $94 Million in expected Nye County property tax revenue over project lifetime
Icon
Up to $1 Million annually in shared lease revenue for Nye County
Icon
Proposed Development Agreement to provide up to $10 Million in direct benefits to Nye County
Icon
Low water use, with voluntary commitments for water conservation
Icon
Energy goes to grid, not to data centers
Icon
Over 1-mile setbacks from residences
Icon
Significant visual screening due to topography
Icon
300-400 construction jobs for Nevada workers

Copper Rays Solar is committed to being a good neighbor

As the developer, owner, and operator of the Copper Rays Solar project, LRE (Leeward Renewable Energy) is excited to join the Nye County community and to continue building a strong foundation of partnership with community members. LRE prioritizes supporting the local organizations and events that mean the most to residents. We look forward to working closely with local residents and community partners as we move the project forward together.

LRE’s mission is to energize communities and fuel energy independence through responsibly developed clean energy solutions. Headquartered in Dallas, Texas for over 20 years, our US-based operations include 30+ operational facilities that provide over 4GW of renewable energy. Learn more at www.LREus.com.

0

Megawatt (MW) Solar Power

0 +

Local Construction Jobs

0 +

Years of Planned Operation

0

Earliest Operational Date

Visual Simulations

These links show simulated views of the project as seen from selected Key Observation Points (KOPs) near the project area. Each document shows one photo of the existing conditions and one simulation of what the view would look like from each KOP once the proposed project is built.

Community Involvement

The Copper Rays Solar Project will be a power generation resource for 36 years or more, providing significant economic development and funding for local public services. LRE prioritizes responsibly sourced, U.S.-made components and local labor. The low-cost, emission-free power supply will help meet domestic energy needs.

As a dedicated member of the community, LRE will work hard to be a good neighbor. Our involvement goes beyond economic investment, job creation, and providing emission-free energy. We strive to build lasting partnerships with local government, community organizations, and individual neighbors. Throughout the life of the project, we pride ourselves on being open in our communication and responsive to feedback while maintaining ongoing community investment.

Permitting

Copper Rays is undergoing an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Additionally, the project is applying to the Public Utilities Commission for Utility Environmental Protection Act (UEPA) approvals and applying to Nye County for all applicable local permits.

Local Benefits

NYE COUNTY TAX REVENUE

  • The project is expected to generate up to $94 million in property tax revenue over its operating life, averaging approximately $2 million annually.
  • The project is also expected to generate significant additional local sales tax revenue during construction and operations.

LEASE REVENUE

  • Under federal law, Nye County is expected to receive 25% of the project’s lease revenue, providing up to an estimated $1 million annually to support county services and priorities.

PROPOSED DEVELOPMENT AGREEMENT BENEFITS

Through a proposed Development Agreement with Nye County, Copper Rays proposes up to an additional $10 million (est.) in direct community benefits, including:

  • $4,000 per MW of constructed solar capacity contribution, totaling up to $2.8 million.
  • Sheriff’s Office Support: $200,000 annually during construction, up to $1 million.
  • Fire Department Support: $55,000 one-time fee plus up to $100,000 annually during operations.
  • Responsible Water Stewardship: Up to $650,000 in water demand offset fees to promote responsible water use.
  • Up to $40,000 to Town of Pahrump for Simkins Park Splash Pad facility.

JOB CREATION AND ECONOMIC DEVELOPMENT

  • The project’s construction is expected to support approximately 300-400 on-site jobs.
  • The project will prioritize the use of qualified Nevada workers whenever possible, with workforce opportunities anticipated for residents of Nye County and the Southern Nevada Region.
  • Long-term operations are expected to create up to five full-time, living-wage positions.

COMMUNITY INVESTMENT
LRE has proudly contributed over $30,000 to organizations and initiatives across Nye County, including the Nye Communities Coalition, local schools, the Pahrump Soroptimists, and Advocates for Children of Rural Nevada.

Community Open House:

You’re invited to join the project team to learn more about Copper Rays Solar, a proposed solar energy and battery storage project in Nye County.
This informal, open-house style meeting is an opportunity for neighbors and community members to view site maps, ask questions, speak directly with the development team, and learn about local economic benefits, environmental stewardship, and project timelines.

Event Details
Date: Tuesday, September 29, 2026
Time: 5:30 PM – 7:00 PM (drop by anytime)
Location: Pahrump Nugget Hotel & Casino 681 NV-160, Pahrump, NV 89048 (Meeting Room / Banquet Hall)

LRE in the Community

https://www.lreus.com/wp-content/uploads/2026/09/TCAT-Award-e1790209003134.jpg

Ridgley Solar and LRE Honored for Educational Support

LRE and the Ridgely Solar project in Lake County, Tennessee were recently honored for their work with the Tennessee Board of Regents Chancellor’s Award for Excellence in Philanthropy for 2026.

https://www.lreus.com/wp-content/uploads/2026/04/LRE-RattlesnakeGravelGrind_img01.jpg

LRE Gets in the Grind at West Texas Bike Event

LRE employees support the annual Sweetwater Rattlesnake Gravel Grind in Sweetwater, Texas.

https://www.lreus.com/wp-content/uploads/2025/09/FrontlineHives-v01-e1790208960500.jpg

On the Frontlines

LRE is a primary sponsor of Frontline Hives, providing funding through the company’s LRE Foundation. With that funding, Frontline Hives has trained more than 50 veterans and first responders in beekeeping and is now expanding its reach beyond Ohio.

icon

Planning

2021
icon

Permitting

2026
icon

Construction Start

2027-2028
icon

Operations Start

2029-2030

Solar Frequently Asked Questions (FAQS)

What will the solar facility look like?

The Copper Rays Solar facility will primarily consist of rows of photovoltaic electric generating modules mounted to steel frames installed on driven steel posts with central inverters spaced throughout the site. The entire perimeter of the project site will be fenced for security and safety.

Will the solar facility reduce my property value?

Well-developed solar projects will not negatively impact property values. A solar energy facility such as Copper Rays Solar is a low-intensity, passive use of land. Once constructed, solar projects do not possess the negative qualities that could theoretically impact property values such as hazardous materials, odor, noise, and excess traffic.

As shown in the visual simulations above, the view of Copper Rays from Pahrump’s residential communities is largely obscured due to significant setback distance and natural topography.

Will the solar facility produce glare or noise?

Solar panel technology has advanced significantly in recent years. Modern solar panels are manufactured with tempered glass and anti-reflective coatings, minimizing glare. The moving mechanical parts of a solar facility produce minimal noise and are typically inaudible beyond the property boundaries based on the setbacks that are included in the facility’s design.

How long will the solar facility be operational?

The average life of a solar facility is approximately 30-40 years, but with proper maintenance, it can last longer.

Who will maintain the property and vegetation?

Copper Rays Solar will be responsible for maintaining the solar facility in a manner that’s compliant with BLM requirements stated in the EIS. We are committed to responsible land stewardship that’s compliant with BLM requirements, that conserves native vegetation and soils to the greatest extent possible, and that is feasible and consistent with a solar power plant. We will ensure proper ground cover, erosion and sediment control, and stormwater management. We will implement vegetation management plans and best management practices that are compliant with BLM requirements.

What happens at the end of the project’s life?

At the end of the life of the Project, Copper Rays Solar’s equipment will be removed at the end of operation, and the land restored according to a BLM restoration and decommissioning plan. The BLM will require a Performance and Reclamation bond for all solar energy projects to ensure compliance with the terms and conditions of the right‐of‐way authorization.

How will the solar facility affect my community?

Construction will bring new employment opportunities, a large direct investment in the community, and local business generated from the purchase of food, fuel, accommodations, and other local supplies. During the construction period there will be a relatively short-term increase in traffic volume and noise, typical of similar projects.

Once the Project is operational, daily traffic to and from the site will be minimal. Throughout its operational life, the Project will not burden Nye County services and utilities; however, it will contribute substantial revenue to local tax authority and provide clean energy in Nevada.

Contact us

If you have additional questions about Copper Rays Solar, please fill out the form or contact